TIMOTHY B. WELLS, PMP
Senior Project
Controls Manager – Lead Planner Scheduler
Corbin, KY
(317) 439-5260 Cell
www.linkedin.com/in/timothybwells LinkedInTim.Wells@TimWells.com
Summary of
Qualifications
27+ years of experience in all aspects of
project controls
in a diverse range of industries; Integrated Gasification Combined Cycle
Power Plant, Gas Compression EPC, Nuclear EPC
(DOE
413.3B), Oil & Gas EPC, Pharma EPC, Process Automation, IT, Medical
Devices, Automotive, Finance, & Entertainment
Self-motivated, good interpersonal skills,
capable of analyzing and solving complex problems through innovative thought
and experience
Scheduling:
·
Proficient
user of Primavera P6 versions 4 thru 8, MS Project, and MS Office suite
(2007)
·
Administering
Primavera user accounts, security profiles, and operational settings
·
Developing
and training on highly effective scheduling standards, status updating techniques,
project management processes & procedures and delivery methodologies
·
Development,
training and implementing highly effective scheduling standards including
planning session prep & facilitation, integrity checks, baseline
management, earning rules EVMTs using P6 Steps (Physical % Complete), CAM
responsibilities, PERT Mean estimating (effort/duration), external
dependencies, P6 settings and setup, and activity code management
·
Developing
and implementing Earned Value Management (EVM) & Control Account
Management systems
·
Developing,
training and managing efficient and objective versus subjective status
collection processes tailored to the appropriate needs of the project.
·
Developing
schedule quality assurance criteria and conducting schedule quality audits to
ensure compliance and fulfillment of contractual scheduling obligations
·
Developing
comprehensive management reports utilizing Primavera activity codes, exports
to Excel & PowerPoint, production / resource curves, and conducting
preemptive analysis of integrated project schedules
·
Schedule
Analysis; critical & near critical path, float, variance, logic, trend,
milestones/KPIs, forecasting and scheduling standards compliance
·
Developing
“What-if” schedule scenarios for proposed change requests
·
Evaluating
project trends with recommended corrective actions to minimize cost overruns
and schedule slippages
·
Conducting
highly effective facilitated planning sessions whereby the triple constraints
(scope/schedule/cost) are rapidly developed, sequenced and translated into
comprehensive scheduling models with deliverable completion criteria
·
Primavera WBS
management
·
Resource
loading and leveling
·
Project
schedule development, maintenance, monitoring, and recovery plan development
for large integrated programs
·
Proven
metrics management skills
Project Controls Management:
· Expert in the management of scope, schedule, costs, risks
and customer expectations for multi-disciplined projects
·
Development,
training and implementation of highly effective project controls standards
including cost, schedule, risk and Earned Value Management
·
Writing and
facilitating the management of vendor contract requirements for scheduling
standards and project controls compliance
· Cost tracking and ERP integration
· Accruals management
· Proven track record in PMO enterprise implementations and
management
·
Proven
ability to unify and motivate cross-functional teams in a strong matrix
environment
·
Developing
and maintaining integrated Performance Measurement Baselines (PMBs)
· Extensive experience with process improvement and workflow
management
·
Effective
communicator in partnering with project team members, consultants and outside
vendors/agencies and facilitating cohesive team interaction
·
Proven track
record in leading teams of schedulers, cost engineers, project controls
analysts and engineers through full project life cycle
·
Implementing
procurement management processes to align with EVM and Control Account
Management systems
Project Manager:
·
Proven
P&L responsibility of multi-million dollar engagements
·
Proven track
record in successfully recovering troubled projects
·
Demonstrated
high proficiency in the IPS project delivery methodology used by Harvard
& Stanford
·
Full
lifecycle risk management
Professional Experience
PPL Electric Utilities / System One
Holdings, LLC. / TB Wells, Inc.1/2015–9/2015
Lead Project Controls Consultant for PPL
Electric Utility – Allentown, PA.
Directed team of 6 cost analysts and 6
planner/schedulers to implement standardized project controls industry best
practices for the PPL Electric Utilities Transmission Project Management
group. Developed scheduling procedures based on industry best practices.
Orchestrated the development of standardized scheduling templates to
facilitate Earned Value reporting. Directed the development of cost
management procedures based on industry best practices.
Highland Partners / Integrated Consulting /
TB Wells, Inc.7/2014–12/2014
Lead Project Controls Consultant at Hiland
Partners – Gillette, WY / OKC, Ok.
Facilitated and participated in the
implementation of a project controls system using scheduling and cost
management industry best practices for the $362m Hiland HH Pipeline project
and $25m Market Center portfolio. Orchestrated contractor invoice
audit. Provided optimized forecasting, tracking of actuals, and applied
strategies for on-time and on-budget project deliveries.
System One Holdings, LLC. / TB Wells, Inc.3/2014–6/2014
Lead Project Controls Consultant for IEA
Assessment – Clinton, IN.
Led team of 5 senior consultants in
assessing and reporting on the project controls capability of an EPC company
(Infrastructure Energy Alternatives/White Construction) delivering Wind and
Solar EPC engagements. Assessed the US and Canadian sites for project
controls compliance and submitted a comprehensive set of recommendations
based on industry best practices.
Southern Company / NS Services / TB Wells,
Inc.9/2013–3/2014
Lead Planner/Scheduler at Southern
Company/Mississippi Power (Kemper) – Meridian, MS.
4+ Billion Dollar Integrated Gasification
Combined Cycle (IGCC) EPC program – Facilitated a major re-plan effort for
Construction, Startup/Commissioning and Training schedules (35000+
activities) in Primavera P6 v7. Facilitated the optimization and
restructuring of the Startup/Commissioning schedules to streamline the
delivery strategy. Documented (Visio) the weekly and monthly status
collection and reporting process to provide standardization and that resulted
in increased efficiency (contract engagement).
Exterran / Footbridge Companies1/2013–9/2013
Project Controls Manager – Pittsburgh, PA
Central Receiving Point (CRP) program –
Restructured existing project controls team, hired two Sr. Planners and
optimized processes and procedures to align with industry best
practices. Facilitated a re-plan effort for 22 resource loaded
schedules in Primavera P6 v7. Administered Primavera user accounts,
security profiles and operational settings. Developed the project
controls portion of an EPC Statement Of Work (SOW) contract, and set up the
Control Account Structure to support the new Performance Baseline tracking
process. Developed and facilitated a new Change Management process.
Babcock & Wilcox4/2010–1/2013
Sr. Planner/Scheduler – West Valley, NY
Nuclear Waste Remediation at West Valley,
NY site - Conducted facilitated planning sessions for DOE (413.3b) integrated
schedule development. Built schedule models and collected and reported
status per DOE requirements.
Project Controls Manager – Lynchburg, VA.
Medical Isotope Production Facility
Construction - Directed the implementation of a comprehensive project
controls system comprised of best practices for Earned Value Mgt, Schedule
Mgt using Primavera P6, Control Account Mgt, Procurement Mgt, Change Mgt, and
NNSA/DOE Cost Sharing Cooperative Agreement proposal and invoicing best
practices. Facilitated a major re-plan effort for the resource loaded
schedule in Primavera P6. Developed the project controls portion of an
EPC RFP contract.
Digital Prospectors Corp / TB Wells, Inc.2/2010
- 4/2010
Project Controls / Master Scheduler at ITT–
Annapolis, MD
Large SAP implementation - Developed
integrated master schedule for large SAP implementation using MS Project
(contract engagement).
ESG Consulting11/2008–12/2009
Project Controls Manager at Chevron–
Pascagoula, MS
$1.2 Billion Refinery Automation Upgrade -
Provided planning and scheduling expertise to Automation Project Managers in
the preparation of resource loaded schedules in Primavera P6 and MS
Project. Managed the development, execution, tracking and analysis of
Primavera P6 schedules. Developed and implemented prudent monitoring
and control best practices for cost and schedule management. Performed
analysis and reporting that reflected planned vs actuals for scope, schedule
and cost.
Coretech / TB Wells, Inc.6/2008 - 9/2008
Project Controls Consultant at Allison Transmissions,
Inc. - Indianapolis, IN.
Program Management Office (PMO) consulting
services - Refined, optimized and documented scheduling best practices.
Assisted in the project controls and strategy sessions for several
multi-million dollar infrastructure and SAP divestiture projects.
Developed, documented and published project management processes and
optimized the in-house ASD Methodology. Conducted best practices
assessment, developed recommendations and developed and implemented a Project
Management Quality Assurance initiative. Mentored project
managers in scheduling and quality assurance audits.
Brillig Systems, Inc.
Project Controls Manager at Eli Lilly–
Indianapolis, IN.5/2007–6/2008
Process Automation Project - Set up MS
Project Enterprise best practices to comprehensively monitor and control the
Process Automation deliverables for a multi-million dollar manufacturing
facility EPC project. Implemented external interface tracking system
between MS Project and P3 master schedule that led to a coordinated delivery
across multiple groups. Mentored Automation customer project managers
in planning, scheduling and estimating best practices. Implemented PMO
best practices.
Automation Scheduler at Eli Lilly –
Indianapolis, IN.
Instrument & Controls Project -
Conducted facilitated planning and schedule development. Implemented a unique
metrics management process enabling the proficient forecasting and reporting
of I&C program deliverables. Implemented external interface
tracking system between MS Project and P3 master schedule, to ensure a
coordinated delivery across multiple groups. Mentored I&C customer
project manager in planning, scheduling and estimating best practices.
Rockwell Automation / TB Wells, Inc.
Senior Project Manager at Roche Diagnostics
- Carmel, IN.8/2006–5/2007
Roche Diagnostics Test Method Validation
(TMV) Project - Provided project recovery services for a high profile,
government mandated project. Set up project management processes for the
delivery of a multi-million dollar engagement validating laboratory test
methods that met FDA compliance. Conducted facilitated planning and schedule
development. Monitored and controlled scope, schedule and cost. Analyzed risk
and developed mitigation strategies. Conducted resource planning and
forecasting. Implemented PMO best practices. Mentored customer project
manager in planning, scheduling, estimating and team management best
practices.
Edge Professional Services / TB Wells, Inc.
Program Manager at Fannie Mae, Inc. –
Washington, DC2/2006–8/2006
End to End Debts & Derivatives Software
Consolidation Project - Set up Program Management Office (PMO) leveraging MS
Project Enterprise Server for the planning, tracking and enterprise
management reporting of seven departmental program related IT projects. This
effort facilitated the delivery of a multi-million dollar engagement
implementing a customized COTS financial management application where 20+
financial management systems were replaced and/or enhanced. Cohesive
management of the stakeholders was a key success factor.
TB Wells, Inc.
Senior Project Manager at Indy 500 –
Indianapolis, Indiana11/2004–10/2005
Provided project recovery services for a
troubled, high profile, mission critical ERP/CRM engagement and facilitated a
successful delivery on-time, on-budget while exceeding stakeholder
expectations. Implemented PMO best practices.
Brillig Systems, Inc.
Program Controls Manager at Eli Lilly –
Indianapolis, IN.6/2003–9/2004
B105 Insulin Manufacturing Facility
Remediation Program - Implemented external interface tracking system between
MS Project and P3 integrated master schedule that coupled with facilitated
planning reduced the client’s typical 5 year manufacturing facility retrofit
by 2.5 years. Set up Program Management Office (PMO) and implemented
PMO best practices for the delivery of a multi-million dollar remediation
project. Mentored automation project managers in schedule, cost and
scope management best practices. Developed metrics to track CSV program
deliverables.
TB Wells, Inc.
Project Management Consultant at APTIGroup,
Inc. – Tulsa, OK1/2002–6/2003
Developed and implemented marketing
strategies and materials for MS Project add-on utilities.
Assisted principle partners in the
promotion of project management services and training including the
development of a highly successful PMP examination prep course.
Project
Management Consultant at Microsoft – Fort Worth, TX.1/2002-3/2002
Provided program
management advisory services to a consulting best practices team that was
responsible for improving business processes. Designed and implemented a
strategy for a common consulting services methodology between two newly
merged ERP/CRM consulting practices. Reviewed three delivery
methodologies and recommended the best choice for the groups.
EDS, Inc.9/1988 –
1/2002
(Formerly SABRE, Inc., formerly a division
of American Airlines)
Senior Project Manager – Tulsa, OK.
Successfully delivered multi-million dollar
IT projects (Infrastructure, Web Development & Application Development),
on-time and on-budget while consistently exceeding stakeholder
expectations. Provided project recovery services for several troubled,
high profile, mission critical external customer engagements. Set up
and managed several Project Management Offices (PMO) and implemented PMO best
practices for the successful delivery of IT HW/SW projects and IT Disaster
Recovery projects.
Specialized
Training and Education
Primavera P6 Rel 8.2
102 - Project Management in Primavera P6
Rel 7
106P - Advanced Project Management in
Primavera P6 Rel 7
MS Project 2003 Server & Advanced MS
Project 2003
Authorizing and Controlling Work – CPM200D
Earned Value Data Analysis Techniques –
CPM400E
Risk Tools, Metrics and Strategies – Carl
Pritchard (PMIWDC)
Planning & Managing Integrated Programs
Planning & Managing Projects
Project Time & Cost Management Using
Primavera Project Planner
Estimating / Risk Assessment
Effective Communications (Jim Cremin)
Tulsa Community College - Computer Science
Professional
Licenses and Affiliations
AACE International
Project Management Professional (PMP)
PMI College of Scheduling
PMI Troubled Projects Sig
Served multiple terms as board member of
Tulsa PMI Chapter – Tulsa, Ok.
Served as charter board member of Microsoft
Project User’s Group (MPUG) – Tulsa, Ok.
References available at http://www.totalprojectsuccess.com/references.htm